Projects

/Projects

CPB Contractors Pty Ltd – Traveston Cattles Dip – Contaminated Site Remediation and Validation

Epic was engaged to provide environmental consulting services to support the Bruce-Highway Road re-alignment, a large-scale civil works project undertaken on behalf of the QLD Government. The specific worksite was the location of a known historic cattle dip, in Traveston, QLD. Throughout this engagement, Epic was able to: Provide cost effective and practical options [...]

Gurner Pty Ltd – Alexandra Multistorey Development – NSW EPA Contaminated Site Audit

Gurner Pty Ltd engaged Brad May, an NSW Environment Protection Authority accredited Contaminated Site Auditor the proposed development located at 444 Gardeners Road, Alexandria. The objective of the Epic commission was to prepare a Site Audit Statement (Part B) and associated Site Audit Report (SAR) on completion of a Detailed Site Investigation Report and [...]

ANZ Bank – Beachcomber Caravan Village – UST Removal and Validation Report

Epic was engaged the ANZ Bank on behalf of the owner of the Beachcomber Coconut Caravan Village in Mission Beach, Queensland to investigate and remove disused UPSS systems as part of a property transaction. The program required a short turn around ESA and groundwater monitoring event completed by Epic that indicated the two underground [...]

Onesteel Manufacturing Pty Ltd – Due Diligence Environmental Site Assessment

Epic was commissioned by Onesteel Manufacturing Pty Ltd (Onesteel) to undertake a Due Diligence Environmental Site Assessment (ESA), for the site located at Ingall St, Mayfield.   This Due Diligence ESA is required to support the proposed property divestment that would identify potential areas of contamination due to current or historical activities. The specific objectives [...]

Coffs Harbour City Council – Part 5 Assessment of Spoonbill Lake

Spoonbill Lake, east Boambee, is situated within an urban dominated local catchment, comprised of privately owned residential properties. It is valued by residents for its recreational amenity and aesthetic. A portion of the site had become inundated with sediment and aquatic weed species, so the council proposed works that would improve maintenance, mitigate flooding [...]

Manorshield – Assessment Report of Ecological Features

Epic prepared a desktop assessment report of ecological features for a property in Queensland. The property fell under a Covenant between the property owner and Brisbane City Council and was pursuant to section 97A(3)(b)(i) of the Land Title Act 1994, for the purpose of protecting the native animals and native plants on the Covenant [...]

Aquila Resources Pty Ltd – Walton Coal Project Flora Survey Report

Epic was engaged to undertake a flora survey of an area near Emerald, Central Queensland. The purpose of the flora survey was to provide a description of the existing flora within the site and identify Endangered, Vulnerable or Near Threatened (EVNT) species under the Nature Conservation Act 1992 that are or are likely to [...]

Goodman Limited – Bushland Management Plan

Epic was engaged by Goodman to prepare a Bushland Management Plan (BMP) for an approved commercial / industrial development in Redbank, Queensland. The BMP was subject to conditions under Ipswich City Council’s Planning Scheme Policy 3 – General Works, Part 3 – Standards for design of Parks and Streetscapes. The site was densely vegetated [...]

Royal Duke Developments – Contaminated Land Audit Multistorey Development

Epic Environmental (Epic) was commissioned by Property Development Solutions on behalf of Royal Duke Developments as the appointed Contaminated Land Auditor as part of the redevelopment of the property located at 50 McLachlan Street, Fortitude Valley. The site was to be redeveloped to a multistorey residential development with a three-level basement carpark, however as [...]

Arrium Onesteel – Acacia Ridge Stage 2 Environmental Site Assessment

Epic Environmental Pty Ltd was engaged by Arrium Onesteel to complete a detailed Environmental Site Assessment for Due Diligence purposes at the Acacia Ridge Coil and Wire Mill. Epic’s scope included an intrusive soil and groundwater sampling program across the operational areas of the site. The site also included a 700m long operational rail [...]